Laserfiche WebLink
Case File: 171n Focused Area Study <br />Page 3 Final Adoption <br />Transportation <br />Much of the plan's evolution was based on the location of a future interchange. The plan includes <br />the use of existing infrastructure where possible, and the development of new connections, <br />including south the 165`h Avenue, a new intersection on Highway 10 near 167`'' Avenue. The plan <br />also identifies the benefits of additional connections from the study area to Carson Street to the <br />north, Twin Lakes Road over the tracks at 173' Avenue. <br />The eventual build out of the area will increase traffic throughout the study area, most notably on <br />Twin Lakes Road, 17155 Avenue, and Highway 10/169. The plan anticipates the need for <br />roundabouts at several key intersections, in part to keep traffic moving, but also to prevent traffic <br />back ups blocking intersections and train lines. Amore defined transportation plan, using the land <br />uses and densities prescribed, will need to be developed to establish long term traffic control <br />measures. <br />ACtlon Motion by Second by Vote <br />Follow Up <br />N:\Departments\CommuniryDevelopment\Planning\Projects\FAST StudyArea\FAST staff report PC for adoption June2010.doc <br />