My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 06-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
06-08-2010
>
5.1. PCSR 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2010 3:12:15 PM
Creation date
6/4/2010 3:24:10 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of cell 17 20 feet to the south. This would also require an amendment to the existing CUP, but <br />the City sees no potential issues with such an amendment. Ms. Stephanie Stolz, on behalf of the <br />Landfill, stated, with respect to expansion in those areas, that the Landfill is not saying it can't be <br />done, it would just be very costly. There are also additional opportunities to implement leachate <br />recirculation systems which could add considerably to the «~aste capacity of the Landfill. The <br />approval of these systems has already been granted by the City. <br />28. The City Council further finds that if an expansion of the Landfill into the buffer <br />zone on the southern boundary of the existing Landfill property were to be approved, such an <br />approval would have to be subject to compliance with Minnesota Rules, the Elk River City Code <br />of Ordinances and the existing CUP and S~VFL for the Landfill, and subject to the Landfill <br />providing the necessary construction details which would allow the City to evaluate and analyze <br />the proposed expansion, including engineering and construction details related to the leachate <br />i <br />management system, a detailed storm water management plan, design details for the Landfill gas <br />system and others as required by the City's consultant. <br />C7 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.