Laserfiche WebLink
Page 5 <br />~~~~~~ <br />(I7) IlZining activities shall not cause excessive vibration off site. If <br />excessive vibration becomes an issue, the City reserves the right <br />to take appropriate measures to alleviate the problem. <br />(18) Groundwater protection measures shall include: <br />a. The operator shall file with the City an emergency spill <br />response plan. The operator shall adhere to this plan in <br />the event there is a spill. <br />b. The operator shall provide the Fire Department w=ith a <br />copy of their flammable or hazardous materials. <br />c. Fuel tanks shall be above ground, properly diked (if <br />required by law), and registered ~=ith ?~~IPCA. <br />d. :~11 incidences that have the potential to adversely affect. <br />groundwater, including but not limited to spills, shall be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be follov~=ed up in writing within 4 <br />working days. <br />e. Gravel wash operations shall be prohibited on the <br />property. <br />f. 11-Zining operations shall be conducted a minimum of five <br />(5) feet above the seasonally high water table. <br />g. The appropriate storm water permit shall be obtained by <br />the operator from MPCA. <br />(I9) Fencing -The entire perimeter of the property shall be fenced. <br />(20) Screening and Buffering - INTO mining operations shall be <br />conducted within two hundred (200) feet of the property boundary. <br />Further, within this two hundred (200) foot buffer area trees shall be <br />left for screening. In open areas where trees do not exist, screening <br />shall be accomplished by the construction of a minimum six (6) foot <br />high berm planted with evergreens. <br />4.) General Provisions- <br />(O1) Permits- Operator agrees to comply with all of the provisions <br />hereof and agrees to save and hold the City harmless from any and all <br />cupST•BaPoz/sr <br />