My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 06-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
06-08-2010
>
5.1. PCSR 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2010 3:12:15 PM
Creation date
6/4/2010 3:24:10 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />~~~~~~ <br />(I7) IlZining activities shall not cause excessive vibration off site. If <br />excessive vibration becomes an issue, the City reserves the right <br />to take appropriate measures to alleviate the problem. <br />(18) Groundwater protection measures shall include: <br />a. The operator shall file with the City an emergency spill <br />response plan. The operator shall adhere to this plan in <br />the event there is a spill. <br />b. The operator shall provide the Fire Department w=ith a <br />copy of their flammable or hazardous materials. <br />c. Fuel tanks shall be above ground, properly diked (if <br />required by law), and registered ~=ith ?~~IPCA. <br />d. :~11 incidences that have the potential to adversely affect. <br />groundwater, including but not limited to spills, shall be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be follov~=ed up in writing within 4 <br />working days. <br />e. Gravel wash operations shall be prohibited on the <br />property. <br />f. 11-Zining operations shall be conducted a minimum of five <br />(5) feet above the seasonally high water table. <br />g. The appropriate storm water permit shall be obtained by <br />the operator from MPCA. <br />(I9) Fencing -The entire perimeter of the property shall be fenced. <br />(20) Screening and Buffering - INTO mining operations shall be <br />conducted within two hundred (200) feet of the property boundary. <br />Further, within this two hundred (200) foot buffer area trees shall be <br />left for screening. In open areas where trees do not exist, screening <br />shall be accomplished by the construction of a minimum six (6) foot <br />high berm planted with evergreens. <br />4.) General Provisions- <br />(O1) Permits- Operator agrees to comply with all of the provisions <br />hereof and agrees to save and hold the City harmless from any and all <br />cupST•BaPoz/sr <br />
The URL can be used to link to this page
Your browser does not support the video tag.