My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 06-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
06-08-2010
>
5.1. PCSR 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2010 3:12:15 PM
Creation date
6/4/2010 3:24:10 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Water Pollution: <br />The site will be operated in compliance with all applicable standards <br />of the Minnesota Pollution Control Agency and the Department of <br />Natural Resources. A National Pollution Discharge Elimination <br />Permit (NPDES) has been obtained for the site. Fuel storage is <br />limited to above ground tanks. Secondary containment is provided <br />for all fuel tanks. <br />f. Topsoil: <br />All topsoil will be retained on the site for as materials for use at the <br />landfill. <br />g. Slopes: <br />The active mining face will be sloped at approximately 1:1. <br />Reclaimed slopes will be backfilled according to the Reclamation <br />Plan. <br />6.) Reclamation Standards <br />a. Schedule: <br />Reclamation will be completed as indicated within the Reclamation <br />Plan. <br />b. Slopes: <br />Slopes will be reclaimed in accordance with the Reclamation Plan. <br />c. Cover and Planting: <br />The slopes will be seeded in accordance with the Reclamation <br />Plan. <br />d. Slopes to Water Bodies: <br />There are no water bodies existing on site. <br />e. Water Bodies: <br />There will be no water bodies resulting from this operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.