Laserfiche WebLink
5. 10b. <br />I <br />i <br />i <br />1' <br />• November 8 NOV 1 1995 3 1995 <br />I'ONSCLTII6 MIXERS File: 230 - 246 -30 <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612. 644.4389 Mike and Jackie Kedrowski <br />1.800. 888 -2923 18837 Dodge Street <br />Fax: 612. 644.9446 Elk River, MN 55330 <br />RE: DRIVEWAY CONSTRUCTION <br />Dear Mr. and Mrs. Kedrowski: <br />As you are aware from discussions with our construction inspector, Ralph Bader, the <br />workmanship on the bituminous paving of your driveway is totally unacceptable and we <br />are going to require the Contractor to repave your driveway. However, given the weather <br />conditions at this time of year, it would be our suggestion that we wait until spring to <br />CIVIL ENGINEERING remove the existing bituminous and repave the driveway. We are concerned that, as the <br />ENVIRONMENTAL weather turns colder than normal, even if the driveway is replaced and is acceptable from <br />MUNICIPAL a structural standpoint, aesthetically, because of the cold weather, it will not have the <br />PLANNING desired appearance. I understand that Ralph Bader has discussed this with you and that <br />SOLID WASTE you are agreeable with waiting. - - <br />STRUCTURAL <br />SURVEYING We appreciate your understanding and tolerance in this matter, and apologize for the <br />TRAFFIC quality of workmanship on your driveway. <br />TRANSPORTATION <br />If you have any questions regarding this issue, please contact me at 644 -4389. <br />ELECTRICAii'MEC:- ANiCAL <br />E�GiNEERING <br />Sincerely, <br />-VAC <br />POWER DISTRIBUTICN <br />SCAR, MSA, CONSULTING ENGINEERS <br />SYSTEM CONTROLS <br />Terry J. rer, P.E. <br />OFFICES IN: <br />• MINNEAPOLIS <br />PRIOR LAKE <br />ST. PAUL <br />WASECA <br />TJM:tw <br />cc: Mr. Pat Klaers, Administrator <br />246- 0812.nov <br />An Equal Opportunity Employer <br />