My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10. SR 11-20-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
11-20-1995
>
5.10. SR 11-20-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 9:11:02 AM
Creation date
6/3/2010 9:17:59 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/20/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.10a. <br />November 16, 1995 <br />CONSULTING ENGINEERS File: 230 - 223 -30 <br />1326 Energy Park Drive <br />Mr. Pat Klaers <br />Sr. Paul, MN 55108 <br />City Administrator <br />612- 644 -4389 <br />City of Elk River <br />1- 800 -888 -2923 <br />13065 Orono Parkway <br />Fax: 612- 644 -9446 <br />P.O. Box 490 <br />Elk River, MN 55330 <br />RE: DOWNTOWN PARKING LOT PAVING <br />Dear Mr. Klaers: <br />As you are aware, a number of questions have been raised about the quality of the paving <br />in the downtown parking lot. We have reviewed this, both internally and with Steve Ach <br />and Phil Hals of your staff. It is our belief that the integrity of the work that was done is <br />CIVIL ENGINEERING: acceptable but the aesthetics are unacceptable. We are recommending to the General <br />ENVIRONMENTAL Contractor, Barbarossa and Sons, that a method of repair would be to hold back sufficient <br />MUNICIPAL funds to seal coat the parking lot and restripe it. Then we would suggest that the City add <br />*LANNING this parking lot to the 1996 Seal Coating Program and restripe it afterwards. This will <br />SOLID WASTE allow the City to complete the landscaping work prior to seal coating. Oftentimes, <br />STRUCTURAL landscaping equipment can mar a bituminous surface. Attached is a copy of a letter that <br />SURVEYING I have sent to Barbarossa and Sons suggesting that this is the best method to address this <br />TRAFFIC problem. <br />TRANSPORTATION <br />We will keep you appraised of any comments received from the Contractor regarding this <br />ELECTRICAL/MECHANICAL issue. For your information, the most current pay estimate on this project already has <br />ENGINEERING: <br />HVAC these funds withheld. <br />POWER DISTRIBUTION <br />SCADA If you have any questions regarding this issue, please call. <br />SYSTEM CONTROLS <br />Sincerely, <br />MSA, CONSULTING ENGINEERS <br />Terry J. aurer, P.E. <br />OFFICES IN: TJM:tw <br />MINNEAPOLIS Attachment <br />PRIOR LAKE 223- 1603.nov <br />ST. PAUL <br />WASECA <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.