Laserfiche WebLink
Memo to Mayor & City Council/EV 01-02 <br />September 17, 2001 <br />Page 2 <br /> <br />The existing septic drainfield located adjacent to the east property line no longer meets the <br />certification requirements. The only remaining site suitable to support a septic drainfield is <br />located along the west property line within a 60 foot drainage and utility easement. The <br />applicant is requesting that 40 feet of the easement be vacated to allow construction of the <br />drainfield. <br /> <br />The city engineer has reviewed the request and suggests that additional information be <br />provided to ensure that surface water drainage from 198th Avenue to the wetland area <br />continues to function once the drainfield has been constructed. <br /> <br />Recommendation <br /> <br />Staff recommends that the City Council approve the attached resolution authorizing the <br />easement vacation with the condition that the applicant provide additional information to <br />the city engineer regarding surface drainage. <br /> <br />S:\PLANNINGKMICHMC\CCREPRTS\EV01-02.DOC <br /> <br /> <br />