My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 05-11-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2010
>
05-11-2010
>
4.1. ERMUSR 05-11-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2010 4:15:08 PM
Creation date
5/18/2010 4:15:08 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal <br />i/~-~~ <br />Utlilt]eS <br />.Zb FZAI~IL SE vE~ LIC' <br />I. ~ r~rp®~e ~~ 5~~ry <br />In order to maintain stable rates and provide reliable services, Elk River ~/Iunicipal Utilities <br />~ERIVIU~ requires financial buffers in the form of reserves to mitigate changes in costs or <br />operational performance. For ERMU there are two utility funds, the Electric Utility and the <br />dater Utility. These funds shall have separate reserves. Their reserve balances shall be <br />classified as either restricted for Debt Service or Unrestricted Designated Reserve. <br />The target levels for these reserves shall be determined by the criteria herein. These target levels <br />and target criteria will be reviewed annually, madified by Utilities Commission to support the <br />longterm goals of ERI~IU, and adapted with the annual budget. Unless otherwise specified by <br />bond covenants, these reserve balances shall be invested cansistent with ERiUIU's Investment <br />Policy policy number ~.~Oa}, <br />2.0 Elec~~°ic Uti~i~r .Reserve C'iass~ Ica'®~s <br />Restricted For Debt Service: This reserve is established to maintain compliance with bond <br />covenants, <br />The target level for this reserve shall be set at the level specified by bond covenants. <br />Unrestricted I~esi ng~ated Reserve: This reserve is established to address the short-term financial <br />variability inherent in operating an Electric Utility. Potential sources of this variability include <br />but are not limited to: risks associated with natural disasters, reduction in overall customer usage, <br />changes in total system load resulting from the actions of large customers, failure to achieve <br />budgeted levels of net income, changes in cost of purchased power, changes in interest income, <br />and general operational exposures. <br />The target level for this reserve shall be set at the sum of b months operating expenditures less <br />depreciation and less purchase power costs plus the sum of next year's total principal and interest <br />payments. The balance above this target level shall be unrestricted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.